Lanes closed at night for bridge work

Published 12:00 am Friday, March 4, 2011

Motorists traveling on I-85 North and South near the Yadkin River in Davidson County will continue to encounter nighttime lane closures as crews work on the I-85 Corridor Improvement Project.
The N.C. Department of Transportation expects the closures to remain in effect Monday through Friday from 8 p.m. to 6 a.m. for the next two months, weather permitting.
The closures affect the inside lanes only of I-85 from the Yadkin River Bridge (Exit 82) to Clark Road (Exit 85). They are necessary to provide crews with enough space to safely build a new bridge that will carry N.C. 150 over the interstate.
NCDOT reminds motorists driving through the work zone to stay alert and obey the posted speed limit.
The I-85 Corridor Improvement Project includes widening 6.1 miles of I-85 from four lanes to eight lanes and replacing eight bridges, including the I-85 bridge over the Yadkin River. It also includes reconstructing the I-85 interchange at Belmont Road. The project is scheduled to be complete by May 2013. For more information about the project, visit www.i-85yadkinriver.com.
For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.