Bridge on Faith Road to be replaced
Published 9:06 am Thursday, December 18, 2014
On Monday, Jan. 3, 2015, NCDOT will close a section of Faith Road between Heilig Road and St. Pauls Church Road to replace the bridge over Crane Creek in the 2600 block. The work is expected to last 5 months. Local traffic will be allowed in the area, however the bridge will be completely closed. A map to the detour routes is provided below but follows as such:
Heading South (towards Faith)
Right onto Heilig Road, Left onto Old Concord Road, Left onto St. Pauls Church Road, Back to Faith Road
Heading North (towards Salisbury)
Left onto St. Pauls Church Road, Right onto Old Concord Road, Right onto Heilig Road, Back to Faith Road
Area Map with Detour Route: